A 4 in slab on 4 in of compacted gravel is the standard base for a wood or metal shed. If the shed is big, sits on soft soil or holds a riding mower, add a thickened perimeter (a monolithic "turned-down" edge). This calculator handles both.

Common shed slab sizes (4 in slab, 10% extra)

ShedFlat slabWith 12 in wide × 8 in deep edgeGravel base (4 in)Form boards
8 × 101.09 yd³ / 49 bags1.52 yd³ / 69 bags1.7 t36 ft
10 × 121.63 yd³ / 74 bags2.17 yd³ / 98 bags2.56 t44 ft
12 × 162.61 yd³ / 118 bags3.31 yd³ / 150 bags4.09 t56 ft

How it's calculated

Slab volume = L × W × thickness ÷ 12. The thickened edge adds a 12 in wide band around the perimeter, as deep as the edge depth minus the slab thickness. Gravel base uses crusher run at about 1.5 tons per cubic yard, plus 15% for compaction. Rebar is laid out on an 18 in grid each way, plus 10% for laps.

Above about 1 cubic yard (a 10×12 slab is 1.5 yd³) a ready-mix truck often costs less and saves you from mixing 70+ bags. Run your numbers in the break-even calculator. If you'd rather set the shed on gravel, use the patio base calculator.

Frequently asked questions

How much concrete for a 10x12 shed slab?

At 4 in thick, a 10×12 slab is 40 cu ft (1.48 yd³). With 10% extra that's about 1.63 yd³, or 74 × 80 lb bags. A thickened edge adds about 0.4 yd³.

How thick should a shed slab be?

4 in is standard for sheds. Use 5–6 in or a thickened edge for heavy sheds, garages or riding-mower storage. Check local codes, since some require footings below the frost line.

Do I need rebar in a shed slab?

It isn't always required, but rebar or wire mesh helps keep cracks from spreading. It's cheap insurance.